Geosynthetics features GeoTree Case Study - Lake Francis Dam Maintenance with GCCM

 

December 22nd, 2020

Geosynthetics logo

The Yuba Water Agency in Yuba County, Calif., was established in 1959 to reduce flood risk and provide a sustainable water supply to the people of the region. Yuba County has historically endured devastating floods, due in part to Gold Rush-era hydraulic mining practices that washed millions of cubic yards of debris into the Yuba River, raising the riverbed and increasing the flood risk.

 
Read the full article here: Geosynthetics 

 

Installing Concrete Cloth at Lake Francis Dam
Installing the Concrete Cloth at Lake Francis Dam