GeoTree Solutions' range of products can be used within a range of applications, industries and markets. Learn more on the GeoTree Industries and Markets page:
GeoTree Industries
GeoTree Markets
Explaining FRPs (Fiber Reinforced Polymers)
FRPs (Fiber reinforced polymers) are composite materials made of a polymer reinforced with fibers. The polymer is usually an epoxy, vinylester or polyester thermosetting plastic that is combined with a fiber, such as glass or carbon, in order to make the polymer strong and stiff.
Currently, these polymers are used in almost every kind of advanced engineering, from aircraft to bridges. Learn more about our range of FRPs and how they can help you.

Repairing Infrastructure with Geopolymers
Repairing infrastructure with geopolymers is what GeoTree Solutions’ range of products was designed to do. Corroded, pitted, damaged, and misaligned pipelines, carrying both potable and non-potable water, culverts, and sewers have all been rehabilitated using our range of geopolymer mortars.
Our range of solutions includes GeoSpray with an option available for drinking water, GeoSpray 61, GeoRoc, GeoPlug and GeoStrong. Learn more here about the range.

Energy
Around the world there are nearly 6,000 Energy terminals and tank farms, and in the US alone there are more than 190,000 miles of liquid petroleum pipelines. The Energy industry is complex, vital, and highly regulated such that owners and operators have a mammoth task to ensure their assets are fully maintained.
GeoTree’s range of solutions are designed to assist in the reduction of long-term maintenance and repair costs. Learn more here.

Department of Transportation Infrastructure
Across the U.S. Departments or Ministries of Transportation look after a combined network of more than four million miles of roads.These thoroughfares are often flanked by slopes, crossed by bridges, and adjacent to ditches which require regular repair and maintenance to ensure the safe operation of the roads.
Learn more here about GeoTree’s range of solutions to the issues faced by the DOT/Ministry maintenance teams.

GeoTree Case Studies
- 108″ CMP Culvert Lined with GeoSpray Geopolymer
- 20-Year-Old Grain Silos Rehabilitated with RenewWrap
- 72″ Brick Sewer Rehabilitated with GeoSpray
- Aging Infrastructure and Sewer Rehabilitation
- Bridge built in 1936 strengthened with RenewWrap® Carbon Fiber System
- Bridge Column and Cap Repair with RenewWrap
- Busy Bridge Structurally Strengthened with RenewWrap FRP
- Bypass Pumping Plan Helped Secure Project
- CMP Culvert Lining
- Concrete columns strengthened at gas plant
- Concrete Plinth Strengthening at UK Refinery with RenewWrap®
- Corrugated Metal Culvert in Danger of Imminent Failure
- Culvert Failure Could Result in Large Sinkhole
- Culvert Failure Threatening Private Homes
- First Aqueduct Water Pipeline Rehabilitated with GeoSpray Geopolymer for SDCWA
- Flexural Strengthening for Busy Bridge with RenewWrap
- Fractured Sewer Line Causes Sinkhole
- GeoSpray Geopolymer Rehabilitation of Storm Drain
- GeoSpray Rehabilitates Industrial Manholes
- GeoSpray® HCE proves its worth by cutting installation time by 25%
- GeoSpray® Helps Resolve High Temperature Issue
- GeoSpray® Municipal Pipe and Manhole Rehabilitation
- GeoSpray® Prevents Further Corrosion
- GeoSpray® Rehabilitates Heavily Damaged Culvert
- GeoSpray® Sanitary Sewer Rehabilitation
- GeoSpray® Used to Line Corroded Culvert
- Hospital Parking Facility Repaired & Strengthened with RenewWrap
- Localized Spalling Rehabilitated with RenewWrap® Carbon Fiber Strengthening System
- Looming Collapse of the 70″ Diameter Culvert
- Minimally Invasite Solutions used to Strengthen Vital Bridge
- Oil Refinery Sewer Manholes Rehabilitated
- Power Plant Cooling Pipes Repaired
- Project to Rehabilitate and Upgrade Storm Water System
- Railroad Bridge Repaired using GeoTree Geopolymer
- Rehabilitate 524 Linear Feet of Brick Sewer
- Rehabilitation of CMP Culvert at Army Airfield
- Rehabilitation of Reinforced Concrete Pipe
- Series of Culverts Along US Highway 31 Rehabilitated
- Severe Corrosion of Twin Arched CMP Culverts
- Severely Deteriorated Corrugated Metal Pipe Rehabilitated
- Significant Experience Required to Complete Culvert Rehabilitation Project
- Slab and Beam Reinforced with RenewWrap FRP
- Solution Created New Structural Penstock within Current Structure
- Steel Bridge Piling Repairs
- Steel Culvert Required Structural Repair
- Structural Liner Created with GeoSpray
- Structural Support Needed for Stormwater Infrastructure
- Textbook Rehabilitation of a Culvert using GeoTree GeoSpray®
- Twin Concrete Box Culvert Rehabilitation
- Twin Parallel CMP Culverts Relined with Geopolymer Mortar
- Use of UV Resistant Pre-Saturated GFRP for Protection of Wood Pilings
- Water Conveyance Tunnel Rehabilitated with GeoSpray Geopolymer