We're proud to see one of our recent case studies featured in Trenchless Technologies Magazine.

The San Diego County Water Authority (SDCWA) carries out regular inspections of its assets to ensure they are in the best working condition. Following an inspection of the First Aqueduct water conveyance system in Valley Center of San Diego, CA, the SDCWA determined that rehabilitation was required. This was to maintain the tunnels’ structural integrity and extend its service life.

Read the full article below
External Job Site
Michels’ proprietary centrifugal application devices