ClockSpring|NRI's TEC talks are now available on-demand. We will be releasing all our talks after initial presentation and invite you to watch them at your leisure using the below links.

We are keen to ensure we continue to deliver information on the products and services that are of interest to you, as well as our range of case studies. If you have any suggestions of topics you would like us to cover, please contact us to let us know.

To learn what TEC talks we have scheduled over the coming weeks, visit the TEC talks page.

 

 AVT VALVES

The alternative to cutting in valves, with no need to shut off the water - what are inline insertion valves
Delivered on April 2, 2020 

Case study, Installing an AVT EZ Valve at an oil refinery
Delivered on April 6, 2020 

No more crumbling pipes - Installing an AVT EZ Valve on Asbestos Concrete
Delivered on May 18, 2020 

 CSNRI COMPOSITES

Basics of Composite Repair Theory
Delivered on April 1 & 3, 2020 

Crack Repair with Composite Materials
Delivered on April 7 & 9, 2020 

Composite Repair Options for Tanks
Delivered on April 14 & 16, 2020

Plant Maintenance with Composites: Cooling Water, Flare & Chemical Lines Delivered on April 21 & 23, 2020

Training Requirements for Composite Repair Systems
Delivered on April 28 & 30, 2020 

Black Diamond Field Bend

Fatigue, Wrinkle, & Dent Repair with Composites
Delivered on May 5 & 7, 2020 

Syntho-Glass XT Apps being installed-web

Composite Repair Design Life & Life Expectancy
Delivered on May 12 & 14, 2020 

Addressing Axial and Bending Loads with Composites
Delivered May 19 & 21, 2020

Pipeline Regulations and Composite Repairs
Delivered on May 26 & 28, 2020

 GEOTREE SOLUTIONS

Introduction to Concrete Cloth GCCM
Delivered on April 8, 2020

GeoTree Concrete Solutions

Specifying geopolymers for your large-diameter pipe rehabilitation projects
Delivered on April 15, 2020

Concrete FRP Pile Repairs in Submerged Environments 
Delivered on April 22, 2020

GeoSpray Geopolymer Mortar System for Structural Rehabilitation of Storm & Sanitary Pipe and MH Infrastructure

Delivered on April 29, 2020