Scaffolding was erected to afford access to the installers who carried out the repair to the gas pipeline, and work got underway.
The first step of the installation process was to prepare the surface of the pipeline to improve adhesion of the composite wrap to the metal surface. Because of the possibility that sparks from power tools and abrasive blasting could lead to an explosion, technicians used hand tools to prepare the surface of the pipe to achieve an St3 surface cleanliness, removing rust, coating, and other contaminants to produce a thoroughly prepared surface prior to the application of the composite system.