ZOAR LEVEE, FIBRWRAP® TYFO® SYSTEM
OVERVIEW
Site preparation and bypass pumping of the creek water and storm flows was provided by the prime contractor, Massillon Stone Company, which utilized an 8-inch dry prime pump and 8-inch irrigation piping. The pumping system had to overcome a 150 vf levee wall to force the water from the base of the levee wall to the top of the levee for discharge. The trenchless repair was performed by entering the line and hand applying the Tyfo® Fibrwrap® CFRP system.
Scope:
- Rehabilitate (as per the sketch shown below)
- 19 circumferential joints using a 12-inch wide strip of Tyfo® SCH 41
- 3 circumferential joints using a 24-inch wide strip of Tyfo® SCH 41
The project was successfully completed to the satisfaction of all parties in February 2017.



PROJECT DETAILS
Project: US Army Corp of Engineers, Zoar Levee 36-inch box, culvert joint strengthening
Location: Zoar, Ohio
Length and Pipe Size: 560 feet, Square 36-inch box culvert
Installation: Hand applied carbon fiber
Owner: US Army Corp of Engineers
Contractor: Massillon Stone

“The Fibrwrap crew was easy to work with. We worked together as a team very well and I appreciate the crew’s efforts. We would absolutely use the Fibrwrap® system on future projects.”
Joel Reott, Project Manager
Massillon Stone
“Interesting product. I can think of many applications we can use that fiber on in the future.”
Joel Reott, Project Manager
Massillon Stone